Due to the planned roadworks between Hockley and Rayleigh, we are operating a reduced 7 timetable until 10th October 2020.
The revised timetable is available on the following link.
https://stephensonsofessex.com/wp-content/uploads/bsk-pdf-manager/2020/09/7-Southend-30.09.20.pdf
Many thanks